Loading...
HomeMy WebLinkAboutO-1882 - An Ordinance Amending Ordinance No. 1868 Chapter 21 Article IV Sewer Section 21-52 Connection Requirements and Connection FeesORDINANCE NO. 1882 AN ORDINANCE AMENDING ORDINANCE NO. 1868; CHAPTER 21, ARTICLE IV, SEWER: SECTION 21-52 CONNECTION REQUIREMENTS AND CONNECTION FEES, FAIRHOPE CODE OF ORDINANCES BE IT ORDAINED BY THE GOVERNING BODY OF THE CITY OF FAIRHOPE, ALABAMA, AS FOLLOWS: SECTION I. The Code of Ordinances, City of Fairhope, Alabama, Chapter 21, Article IV. Sewer. Section 21-52 (b) (2) is hereby amended to reflect the following changes and additions: Sec. 21-52 CONNECTION REQUIREMENTS AND CONNECTION FEES 2. The Sewer SDCs are established to recover incremental costs for capital needs related to expansion of capacity, treatment, and transmission infrastructure of the Sewer System based upon the demand created by new customers and connections. The minimum new service water meter size is I", however previously approved homes or developments with a water meter approved at 3/" shall be subject to a Sewer SDC of $4,476. SECTION II. The Code of Ordinances, City of Fairhope, Alabama, Chapter 21, Article IV. Sewer. Section 21-52 (b) (4) is hereby amended to reflect the following changes and additions: Sec. 21-52 CONNECTION REQUIREMENTS AND CONNECTION FEES 4. Connection Requirements: The owner of the property requesting service shall be responsible for providing Sewer connection to the property. The City of Fairhope may connect the property to Sewer service at the fees shown in the Installation (Tap) Fees Schedule or provide a cost estimate of labor, materials, and any repair of concrete or asphalt if Sewer is immediately available. The City of Fairhope may provide a cost estimate of labor, materials, and any repair of concrete or asphalt to the owner for the work if Sewer is not currently available, or based upon capacity or location limitations, may state that Sewer is unavailable for the property. All taps into Sewer mains shall be performed by a vendor approved by the City of Fairhope Utilities Water/Wastewater Superintendent. The Balance of Chapter 21-52. Connection Requirements and Connection Fees remains as written and codified in the City of Fairhope Code of Ordinances. SEVERABILITY The sections, paragraphs, sentences, clauses and phrases of this Ordinance are severable, and if any phrase, clause, sentence, paragraph or section of this Ordinance shall be declared unconstitutional by a court of competent jurisdiction, then such ruling shall not affect any other paragraphs and sections, since the same would have been enacted by the municipality council without the incorporation of any such unconstitutional phrase, clause, sentence, paragraph or section. Ordinance No. 1882 Page -2- EFFECTIVE DATE This Ordinance shall take effect upon its due adoption and publication as required by law. ADOPTED THIS THE 1 OTH DAY OF AUGUST, 2026 I J� �" s Reid Conye]� :, C ncil President Attest: sa A. anks, MMC City Clerk ADOPTED THIS THE IOTH DAY OF AUGUST, 2026 aac Sherry Sul ivan, Mayor