HomeMy WebLinkAbout02-09-2026 City Council Work Session MinutesSTATE OF ALABAMA }
COUNTY OF BALDWIN )
The City Council met in a Work Session
at 4:30 p.m., Fairhope Municipal Complex Council Chamber,
161 North Section Street, Fairhope, Alabama 36532,
on Monday, 9 February 2026.
Present were Council President Jimmy Conyers, Councilmetnbers: Jack Burrell,
Joshua Gammon (arrived at 4:35 p.m.), Jay Robinson, and Andrea Booth, Mayor Sherry
Sullivan, City Attorney Marcus E. McDowell, and City Clerk Lisa A. Hanks.
Council President Conyers called the meeting to order at 4:34 p.m.
The following topics were discussed:
• The first item on the Agenda was the Presentation: Fairhope Junior City Council Annual
Project by President Camille Hausman and Secretary Bethany Pierce. (See attached
Handout titled "FJCC Project Proposal")
• The Discussion on the Wastewater Treatment Plant Utility was next on the Agenda.
Caleb Leach, P.E. with Krebs Engineering, Inc. Briefly went over the Power Point
Presentation titled "Wastewater 'Treatment Plant Phase 2 Improvements." (See attached
Power Point Presentation) Mr. Leach said there is a Master Plan and two additional plans.
Council President Conyers questioned the price of a new plant; and the risks while
upgrading. Mr. Leach replied a new plant would cost one hundred million dollars.
Councilmember Burrell questioned capacity and infill. Mr. Leach responded there is a
redundancy issue with the UV System. Mayor Sullivan stated with limiting our territory
all that is needed is an upgrade. Councilmember Gammon questioned what Cities get to 8
MGD. Mr. Leach said we are trying to get to 6 MGD with a peak between 12 to 15
MGD. The filters, the cost of building, and redundancy were questioned. Mr. Leach said
it would be just shy of forty million dollars.
• The next item on the Agenda was the Discussion of Professional Services Purchasing
Policy by City Treasurer Kim Creech. She said they would like to select an entity and
bring forward contract with a not -to -exceed amount. Council President Conyers said he
was agreeable with a one step process. Councilmember Burrell said he would agree to
$25,000.00. The Mayor's spending limit was discussed too. Councilmember Robinson
explained the need for this policy. The consensus was to move forward and put on the
next agenda.
• Councilmember Burrell said Airport Authority will be tomorrow night. He said the
Harbor Board discussed dredging at Fly Creek.
• Councilmember Gammon gave a brief update on the Tree Committee; and said the
Fairhope Env.ronmental Advisory Board meeting will be on Friday.
• Council President Conyers said the Parking Authority meeting was moved; and the
Fairhope Public Schools Commission discussed the 3-mil Principal Presentations.
• Councilmember Robinson mentioned the Historically Significant Building Demolition
Review Ordinance on the City Council meeting tonight.
Monday, 9 February 2026
Page -2-
• Councilmember Booth mentioned History Day and the projects; gave a shout out to
Interim Public Works Director John Thomas; commented Chief Hollinghead makes
Fairhope better; and said the Friends of the Fairhope Public Library's Chocolate and
Champagne Gala was a great success.
• Gas Director Wes Boyett addressed the City Council regarding Agenda Item No. 17; and
answered any questions if needed.
• City Engineer Richard Johnson addressed the City Council and explained the reason there
is only one company for bridge inspections. He addressed Agenda Items No, 9, No. 12,
and No. 25 (an add on item); and answered any questions if needed.
• City Treasurer Kim Creech addressed the City Council regarding Agenda Item No. 21;
and answered any questions if needed.
• Building Official Erik Cortinas addressed the City Council regarding Agenda Item No. 7;
and answered any questions if needed.
• Interim Public Works Director John Thomas addressed the City Council regarding
Agenda Item No. 11; and answered any questions if needed.
• Police Chief Stephanie Hollinghead addressed the City Council regarding Agenda Items
No, 18, No. 19, and No. 20; and answered any questions if needed.
• Water and Wastewater Superintendent Daryl Morefield addressed the City Council
regarding Agenda Items No. 13, No. 14, No. 15, and No. 16; and answered any questions
if needed.
There being no further business to come before the City Council, the meeting was
duly adjourned at 6:02 p.m.
Oes'Reid Cony , Jr.
Yulincil President
to
Ik'sa A.Ihanks, MMC
City Clerk
Date: February 2nd, 2026
Fairhope City Council
2/9/26 City Council meeting
161 N Section St., Fairhope, AL 36532
Subject: The proposal of the Junior City Council annual project
Dear Fairhope City Council
Every year, the Fairhope Junior City Council is charged with the responsibility of presenting and
executing a group project. This year, the council has decided to present the idea of hosting a
community centered pickle ball tournament.
The council is repeating permission to host the event at the Mike Ford Tennis Courts. Not only
do we intend for this event to bring the community together, we also intend for it to be a
beneficial fundraiser, in which the money will be donated to the Fairhope Rotary Club. We intend
for this event to bring out those participating in the tournament as well as those who simply want
to watch, creating a community -centered, family -friendly day.
The Fairhope Junior City Council thanks you for your time and consideration in approving and
supporting our annual project.
Sincerely,
The Fairhope Junior City Council
Fjccprojectproposal
PROJECT NAME: FJCC Picklebal) Tournament
DATE: PROJECT
2/9/26 PROPONANT: Camille Hausman
Z
O A proposed pickleball tournament at the Mike -Ford Tennis Center, a
Mcommunity -centered, family -friendly venue intended to be inclusive of all
residents. The primary objective is to unite Fairhope residents for a day of
Wcompetition and social connection while raising funds for the Fairhope Rotary
® Club.
6i
> . An event where the community can be brought together.
v. Beneficial fundraiser where money is donated to Fairhope's Youth Rotary
LU Club.
m
O
E9
O L Arrive early to prep (concessions, sign-up table, etc).
J
G 2. Begin welcoming players and allowing warm up
O 3.Begin playing (pool play)
a=.. 4_ Awards ceremony & closing with trophies.
w
Estimate:
w Trophies/ medals: $250 Total: $950
a Pickleballs: $150
CI
Concessions: $350
Misc/ First aid: $200
LL
LL
0
2
H
N
FiccPro)OCC(Proposoll
PROJECT NAME: FJCC Pickleball Tournament
DATE: PROJECT
2/9/26 PROPONANT: Camille Hausman
Febuary 91h 2026 project approval
March 30th begins publishing posters/social media
Saturday, April &tt'• pickleball tournament 8-3.
8:00-9:00 AM: Playercheck-inn
9:00-9:15 AM: Rule briefing
9:15 AM -12:15 PM: Pool play
1215- L00 PM: Results tally
1.00 - 2:30 PM: Bracket matches
2:30-3:00 PM: awards
Agree [] Disagree
i
t Febuary 9th 2026
�KREBS
_ _ tay�..,ra�
City of Fairhop
Wastewater Treatment Plant
Phase 2 Improvements
February 9J2026
MONDAY, FERRUARY 9. 2020
WASTEWATER TREATMENT PLANT - PHASE 2 IMPROVEMENTS
R
INN
1w,
)VERVI EW OF TODAY'S DISCU`
zgzrymk�—A o
• BACKGROUND 71mr,
• WASTEWATER TREATMENT ISSUES (GEN
• RECOMMENDED IMPROVEMENTS
• BENEFITS
• PRELIMINARY PROJECT SCHEDULE
• PRELIMINARY COST ESTIMATE I
• QUESTIONS
KREBS
fNC>INEERIN�
WASTEWATER TREATMENT PLANT PHASE 2 IMPROVEMENTS
2
q BACKGROUND
�r to
• Discussions on Need for Additional Treatment Capacity — 2023
(Construct New/Greenfield WWTP or Expand Existing WWTP?)
• Wastewater Treatment Master Plan (Fall 2025)Ar
`
• Phase 1— Headworks Improvements (Spring 2026 Completion) "
• Updated/Revised Wastewater Service
KREBS
E_NGf,kE ERING
In Progress)
WASTEWATER TREATMENT PLANT PHASE 2 IMPROVEMENTS
3
Aw�..
TEWATER TREATMENT ISSUES GENERAL -
Primary Issues
• Need additional treatment capacity
. Lack of Redundancy
<, Aging/Inefficient Equipment and Treatm,
'+ Processes
Existing Facilities Not Designed for Expar
• Small site/Limited Space Available
` Other Issues
• O&M Costs too High
Too much Equipment/Too Many _
Pumps/Motors s �'
• Odors and Noise °}<
FAIRHOPE WASTEWATER
TREATMENT IMPROVEMENTS
CONCEPTUAL SITE PLAN
LEGEND
O EXISTING FACILITIES INCLUDES PHASE 1 HEADWORKS IMPROVEMENTS}
PHASE 2 - *PROVEMENTS TO EXPANO TO B MGD CAWM
!� PHASE 3 • FUTURE EXPANSION TO 12 MGD CAPACITY
CONVERT EXISTING "ST NG VLR
FILTER PUMP STATION BASIN
TO ORAIN PVAIP STATION
F
REPLACE EXISTING
FUZZY FILTERS
WMEW TERTIARY
CLOTH FILTERS
EXPAND OR REPLACE
UV DISINFECTION SYSTEM
-ROMDE SECONDAR.
OUTFALL PIPING
AT EXISTING OR
NEW UV EFFLUENT
op,
60 D . 30 OD
1 INCH - 60 FT.
KREBS
EN G IN EE RI NG
r
eaLill
MODIFY EXISTING OW2IFIERS
TO IAPROVE ASKM TO HANDLE
SOLIDS LOA0ING AT HIGHER FLOW RATES
130
NEW AERATION
FORINCREASED
CAPACITY
11- ELEC-Al*4t IK-VTy,•-
FUTURE R ` a
PAS RIAIPS
R
3
AERO
PC DIGEST
13X
571
000 GAL
CR
C.1
G
L' ea
I
i NEV. SLOWERIELEC. SUIDING w••.w•� SOLIDS H MG
FOR AERATION WINS
WASTEWATER TREATMENT PLANT PHASE 2 IMPROVEMENTS
5
PHASE 1
HEADWORKS ISSUES
• No Redundancy or By -Pass
• Need More Capacity
• Screenings Wash/Removal
• Odors
• Difficult Maintenance
• Grease Removal
KREBSWASTEWATER TREATMENT PLANT PHASE 2 IMPROVEMENTS 6
ENGINEFRING
KREBS
FNGINEERING
Ilia
PHASE 1
H EADWORKS
IMPROVEMENTS
• 2 New Screens
• New Grit System
• No Aeration
• New Influent Piping
• Increased Capacity
• Redundancy
• $4.8 Million
Spring 2026 Completion
I'
I
_l
WASTEWATER TREATMENT PLANT PHASE 2 IMPROVEMENTS I 7
RECOMMENDED PHASE 2 IMPROVEMENTS
K• EBS WASTEWATER TREATMENT PLANT PHASE 2 IMPROVEMENTS
ENGINEERING
ISSUES WITH EXISTINGi
BIOLOGICAL TREATMENT
(AERATION BASINS) j
Limited Treatment Capacity
(2.5+/- MGD Per Process Tank)
Inefficient Technology
Insufficient Tank Volume and Air
Flow Control/Distribution
Limited Tank Redundancy
Too Much Equipment to Maintain
15+ Motors
Proprietary System(s)
Inefficient Use of Available Space
KREBS
ENGINEERING WASTEWATER TREATMENT PLANT PHASE 2 IMPROVEMENTS
IMPROVEMENTS TO BIOLOGICAL
TREATMENT (AERATION BASINS)
DEMOLISH
EXISTING VLR
BASIN /
x
lIoIix LL
,4GBS
ENG IN EERI NG
DEMO
U
ooU
NEW BLOWERIELEC. BUILDING
FOR AERATION BASINS
.-r r
r r
CONTROI
BUILDING
Improvements
• New Blowers and Building
• Fine Bubble Aeration
(Similar to Existing Aerobic Digesters)
• New Instruments and Controls
• Demolish VLR Basin
• Convert Orbal Basin to Fine Bubble
• Convert Digesters to Aeration Basins
Benefits
• Increase Capacity (Tank Volume and Air)
• Full Redundancy
• Simple/Efficient/Non-Proprietary
• Reduce Number of Motors/Equipment
(from 15 to 3?)
• Relatively Easy Future Expansion
WASTEWATER TREATMENT PLANT PHASE 2 IMPROVEMENTS I 10
Q
z
CO
omo
�-
w
CLLJ
)r Z
Z
w
Q
z�--
U
cn
C
cnz
co—w
cc(
Y.
ISSUES WITH
EXISTING CLARIFIERS
Operating at Capacity (Peak Flows)
Proprietary Technology, But Poor
Performance
Limited redundancy
Insufficient Depth
Uneven Flow Distribution
Insufficient Baffling
Rotating Bridge
No Scum and Grease Removal
Limited Space for New Clarifier(s)
U
,lCREBS WASTEWATER TREATMENT PLANT PHASE 2 IMPROVEMENTS 12
.KR EE.RING
_ _x----x-\
KREBS
E NG IN EE_RING
NEW CLARIFIER
• Build a 3rd New Clarifier
• Add Flow Distribution
• Same Diameter as Existing, but Deeper
• Non -Proprietary
• Better Technology
• Improved Performance
• Redundancy
WASTEWATER TREATMENT PLANT PHASE 2 IMPROVEMENTS 13
REHABILITATE EXISTING CLARIFIERS
• Retrofit Existing Clarifiers with Scum and Grease Removal (Phase 1)
• Replace Bridge, Influent Baffling, and Sludge Collection Mechanism
• Incorporate Additional (Stamford) Baffle
• Eliminate Maintenance of a Rotating Bridge
WEIR EL. 30.17 y
HWL. 29.17
V
IGH SLAB
;RARE EL. 21.00± o
VER U
)N)
NIT
' 1 � T/FOOTING EL. 13.7/�'F./ ° J
KF���S
E NG_I�H_EERING
T/WALL EL. 31.67
DENSITY
CURRENT
BAFFLE
71"/ 1 / 1 -,
92'-0"
WEIR DIAMETER
4 O
C • V
' °• L —
i
i
6" D.I.SCUM _
i
v'
- �— - — 30" D.I. INFLUENT— - — -
\11-16" D.I. RAS
..WASTEWATER TREATMENT PLANT PHASE 2 IMPROVEMENTS I 14
S WITH
MARY FILTERS
v1GD Capacity
for Influent Flow
-s for Backwash
pensive to Expand
hnology
E NGIN EEa1 NC - -WASTEWATER TREATMENT PLANT PHASE 2 IMPROVEMENTS 15
Effluent
'W efr I
Effluent
ca"ttal
Drive Motor ,� InUumt
influent Weir I
Ila
Pump
*Sh
Pump
vatves
TERTIARY FILTER
IMPROVEMENTS
• Replace Existing Filters with New
"Cloth Disc Filters"
• Gravity Flow (No Pumps)
• Minimal Headloss
• Small Footprint
• Easily Expandable
• 5 or 10-micron cloth
• Small < 10 HP backwash pumps
• Non -Proprietary
KREBSWASTEWATER TREATMENT PLANT PHASE 2 IMPROVEMENTS 16
ENGINEERING
''KREBS - -
;ENGINEE.RING
ISSUES WITH
EXISTING UV DISINFECTION
AND OUTFALL PIPING TO MOBILE BAY
• Two (2) UV systems/channels
• Insufficient capacity
• Limited redundancy
• Newer UV system is at capacity
• No support for older UV system
• Most UV systems are proprietary
• Floods during peak flow events
• Expensive to Retrofit
• Outfall Pipe to Mobile Bay is at capacity (Peak Flows)
• Outfall pipe restrictions are partially to blame for
flooding in UV building
WASTEWATER TREATMENT PLANT PHASE 2 IMPROVEMENTS
17
UV DISINFECTION AND SECONDARY OUTFALL IMPROVEMENTS
EXPAND OR REP'
UV DISINFECTION SY
PROVIDE SECONDARY
OUTFALL PIPING
AT EXISTING OR
NEW UV EFFLUENT
KREBt
ENGINEEPING
Increase capacity from 12 MGD to 18 MGD
Re-use/Re-Locate newer UV equipment
Provides redundancy
Easily expandable to 24 MGD capacity
Raise UV channels to prevent flooding
Increase pipe sizes/hydraulic capacity
Construct secondary outfall
Avoid need to replace existing outfall pipe
into Mobile Bay
WASTEWATER TREATMENT PLANT. PHASE 2 IMPROVEMENTS 1 18
x
X X X x X�
E NG INE E R I NG
{
+� DIGESTER AND SOLIDS DEWATERING
IMPROVEMENTS
• New aerobic digesters
• New solids dewatering building
• Digested solids pumps (to feed the belt press)
• New belt press (either rent or purchase)
• New pump/conveyor for dewatered solids
• Solids storage area
• Odor control for new headworks and digesters
WASTEWATER TREATMENT PLANT PHASE 2 IMPROVEMENTS 1 20
IV
KREBS
ENGINEERING
YARD PIPING AND ELECTRICAL
IMPROVEMENTS
• Some existing influent piping is too small
and/or needs to be relocated.
• Most large -diameter process piping is too
small and/or needs to be relocated.
• Substantial electrical improvements an
d
nd �
upgrades will be needed.
• A new electrical building/room will be j
needed.
• Intent is to re -use existing standby power
9 generator
WASTEWATER TREATMENT PLANT PHASE 2 IMPROVEMENTS I 21
i
BENEFITS OF RECOMMENDED IMPROVEMENTS i
• Increases treatment capacity to 8 MGD (average day) and 18 MGD (peak day)
• Uses existing site/existing facilities.
• Avoids the need for a 2nd (expensive) "greenfield" treatment facility.
• Avoids need for a 2nd permitted discharge into Mobile Bay.
• Provides additional treatment capacity needed now.
• Provides redundancy for treatment processes and equipment.
• Facilitates future expansion to maximize use of existing site.
• Simplifies operations.
• Substantially reduces quantity of pumps, motors and equipment.
• Reduces/controls future 0&M costs.
KREBS ---- —— -�-
WASTEWATERTREATMENT PLANT PHASE 2 IMPROVEMENTS 22
ENGINEERING
QUESTIONS?
MONDAY, FEBRUARY 9, 2015 WASTEWATER TREATMENT PLANT PHASE 2 IMPROVEMENTS 25