HomeMy WebLinkAbout05-02-2024 Special-Called City Council Agenda Packet
CITY OF FAIRHOPE
CITY COUNCIL REGULAR AGENDA
Thursday, May 2, 2024 - 11:00 AM
City Council Chamber
Council Members
Jack Burrell
Corey Martin
Jimmy Conyers
Jay Robinson
Kevin G. Boone
Invocation and Pledge of Allegiance
1. Resolution - To award (Bid No. 24-042) to Gator Boring & Trenching, Inc. for Water
Main Repair/Replacement at US Highway 98 Crossing Fly Creek with a total bid
proposal of $599,304.75.
2. Adjourn
Next Regular Meeting – Monday, May 13, 2024 – Same Time Same Place
Page 1 of 25
CITY OF FAIRHOPE
AGENDA MEMORANDUM Item ID: 2024-394
FROM: Daryl Morefield, WATER SUPERINTENDENT
SUBJECT: The Superintendent of Water/Wastewater, Daryl Morefield, is
seeking to hire a qualified contractor to replace the 12-inch water
main from south of Woodlands Drive along Highway 98 to north of
Fly Creek.
AGENDA
DATE:
May 2, 2024
RECOMMENDED ACTION:
To approve the award of Bid No. 24-042 Water Main Repair/Replacement at US
Highway 98 Crossing Fly Creek (Option 1) to Gator Boring & Trenching, Inc. for
$599,304.75.
BACKGROUND INFORMATION:
A service bid was issued on April 5, 2024, posted to the City of Fairhope's website, and
published in the Gulf Coast Media. Three (3) responsive bids were received at the bid
opening on April 25, 2024 at 10:00 a.m.
Pricing for three options were originally requested in the bid. Option 1 will replace the
water main from south of Woodlands Drive along Highway 98 to north of Fly Creek. This
would eliminate the existing hydraulic restriction under Woodlands Drive and replace
the broken 12-inch water main under Fly Creek. Option 3 would replace the water main
from north of Woodlands Drive along Highway 98 to north of Fly Creek. This replaces
the broken 12-inch water main under Fly Creek but does not eliminate the hydraulic
restriction. It should be noted that Option 2 was eliminated from the project during the
bid period by addendum. It was for an aerial crossing over Fly Creek along the existing
pedestrian bridge. This option's cost and long-term structural viability are why it was
eliminated from the bid.
The Superintendent of Water/Wastewater recommends the award for Option 1 to Gator
Boring & Trenching, Inc. for the low bid amount of Five Hundred Ninety-Nine Thousand
Three Hundred Four Dollars and Seventy-Five Cents ($599,304.75).
Previous Action: April 8, 2024 Resolution #5030-24 - Awarded RFQ PS24-018-2024-
PWI-20 Professional Engineering Services for Water Main Repair/Replacement at US
Hwy 98 Crossing at Fly Creek to Krebs Engineering in the amount of $48,000.00.
Page 2 of 25
BUDGET IMPACT/FUNDING SOURCE:
Account No. Account Title Current Budget Cost Available
Budget
004010-
59500
Water-Utility
System
Improvement
$599,304.75 $599,304.75 ($____)
Upgrade Treatment Plant 1 project has an estimated savings of $1 Million.
GRANT:
N/A
LEGAL IMPACT:
N/A
FOLLOW UP IMPLEMENTATION:
For time-sensitive follow up, select deadline date for follow up: N/A
Individual(s) responsible for follow up: N/A
Action required (list contact persons/addresses if documents are to be mailed or
emailed): N/A
Page 3 of 25
RESOLUTION NO. _____
BE IT RESOLVED BY THE GOVERNING BODY OF THE CITY OF
FAIRHOPE, ALABAMA, as follows:
[1] That the City of Fairhope did request, receive, and open bids to procure services
for (Bid No. 24-042) Water Main Repair/Replacement at U. S. Highway 98 Crossing
Fly Creek for the Water Department at 555 South Section Street, City of Fairhope
offices, Fairhope, Alabama.
[2] At the appointed time and place, bids were received and tabulated as follows:
Please see attached Bid Tabulation
Water Main Repair/Replacement
at U. S. Highway 98 Crossing Fly Creek
for the Water Department
[3] After evaluating the bids with required specifications, Gator Boring & Trenching,
Inc. is now awarded (Bid No. 24-042: Option No. 1) Water Main Repair/Replacement
at U. S. Highway 98 Crossing Fly Creek for the Water Department with a bid
proposal of $599,304.75.
DULY ADOPTED THIS 2ND DAY OF MAY 2024
_______________________________
Corey Martin, Council President
Attest:
_____________________________
Lisa A. Hanks, MMC
City Clerk
Page 4 of 25
2100 River Haven Drive Birmingham, AL 35244 P 205 987 7411 KrebsEng.com
BIRMINGHAM HUNTSVILLE MONTGOMERY NEWNAN
April 25, 2024
Mr. Daryl Morefield
City of Fairhope
555 South Section Street
Fairhope, AL 36532
Re: Bid No. 24-042 - Water Main Repair/Replacement at US Highway 98 Crossing Fly Creek;
Krebs Project No. 24026
Dear Daryl:
Three (3) bids were received for the above-referenced project at 10:00 P.M., CDT, on April 25,
2024. The order of the bids received, beginning with the low bidder, was as follows:
Contractor Option No. 1 Option No. 3
Gator Boring & Trenching, Inc. $599,304.75 $317,990.20
Equix Energy Services $662,282.50 $527,257.50
Norris Bros Excavating, LLC $861,426.50 $492,244.50
Option 1 will replace the water main from south of Woodlands Drive along Highway 98 to north of
Fly Creek. This would eliminate the existing hydraulic restriction under Woodlands Drive and
replace the broken 12-inch water main under Fly Creek. Option 3 will replace the water main
from north of Woodlands Drive along Highway 98 to north of Fly Creek. This replaces the broken
12-inch water main under Fly Creek but does not eliminate the hydraulic restriction. It should be
noted that Option 2 was eliminated from the project during the bid period by addendum. It was
for an aerial crossing over Fly Creek along the existing pedestrian bridge. This option's cost and
long-term structural viability are why it was eliminated from the bid.
Krebs reviewed the bids and determined Gator Boring and Trenching, Inc. meets the
requirements of the low, responsible, responsive bidder as outlined in the Contract Documents.
Attached is a copy of the certified bid tabulation for your records. Based on conversations with
the City following the bid opening, the City desires and has the budget to complete the entire
water main replacement (Option 1).
Page 5 of 25
Mr. Daryl Morefield
April 25, 2024
Page 2
Based on this, Krebs recommends awarding the contract for the Water Main Repair/Replacement
at US Highway 98 Crossing Fly Creek to Gator Boring & Trenching, Inc. for the low tendered bid
amount of $599,304.75.
Please contact us if you have any questions or comments.
Sincerely yours,
Krebs Engineering, Inc.
By____________________________
Caleb L. Leach, P.E.
Associate
cc: Rob Vaughan
Krebs File No. 24026
Page 6 of 25
KREBS ENGINEERING, INC
2100 RIVER HAVEN DRIVE
BIRMINGHAM, AL 35244
205-987-7411
BID NO.: 24-042
KREBS JOB NO.: 24026
DATE: April 25, 2024 @ 10:00 AM, Local Time
OWNER: City of Fairhope, Alabama
DESCRIPTION: Water Main Repair/Replacement at US HWY 98 Crossing Fly Creek Gator Boring & Trenching, Inc.Equix Energy Services Norris Bros Excavating, LLC
1800 Blackbird Lane,32410 Blue Star Highway,22 Northside Lane,
BASE BID Option 1 Pensacola, FL 32534 Midway, FL 32343 Crossville, TN 38571
Item
No.
Approximate
Quantities Description of Item Units Unit Price Total Price for Item Unit Price Total Price for Item Total Price for Item
1 1
Mobilization/Demobilization, Not to Exceed 5% of Total Bid
Lump Sum LS $28,000.00 $28,000.00 $25,000.00 $25,000.00 $35,015.00 $35,015.00
2 100
12” D.I. Pipe, CL. 350, P-O Joint w/ Restraining Gaskets,
Furnished and Installed,
Per Linear Foot
LF $380.00 $38,000.00 $250.00 $25,000.00 $300.00 $30,000.00
3 1000
16” HDPE Pipe, DR 9,DIPS, Furnished and Installed, by
Horizontal Directional Drilling,
Per Linear Foot
LF $320.00 $320,000.00 $330.00 $330,000.00 $600.00 $600,000.00
4 1650
Ductile Iron Fittings, Furnished and Installed,
Per LB LBS $24.75 $40,837.50 $28.00 $46,200.00 $6.00 $9,900.00
5 2
12” D.I. Gate Valves, MJ-MJ, Furnished and Installed,
Per Each EA $8,000.00 $16,000.00 $8,500.00 $17,000.00 $4,000.00 $8,000.00
6 2
16” HDPE MJ Adapters, DR9, DIPS, Furnished and Installed,
Per Each EA $1,200.00 $2,400.00 $7,000.00 $14,000.00 $1,000.00 $2,000.00
7 1
3/4” Corporation Stop, Furnished and Installed,
Per Each EA $1,000.00 $1,000.00 $250.00 $250.00 $2,000.00 $2,000.00
8 2
Cast Iron Valve Boxes, Furnished and Installed,
Per Each EA $455.00 $910.00 $2,500.00 $5,000.00 $300.00 $600.00
9 2
Concrete Valve Markers, Furnished and Installed,
Per Each EA $400.00 $800.00 $1,000.00 $2,000.00 $150.00 $300.00
10 2
Connection to Existing System, Furnished and Installed,
Per Each EA $9,600.00 $19,200.00 $12,500.00 $25,000.00 $9,000.00 $18,000.00
11 1
Asphalt Trail Pavement Replacement, Furnish and Install
Lump Sum LS $10,135.00 $10,135.00 $12,500.00 $12,500.00 $10,000.00 $10,000.00
12 5
Curb Inlet Filter, Furnished and Installed
Per Each EA $1,160.00 $5,800.00 $150.00 $750.00 $300.00 $1,500.00
13 5
Straw Wattles (20”) Ditch Check, Furnished and Installed
Per Each EA $500.00 $2,500.00 $55.00 $275.00 $1,000.00 $5,000.00
14 300
Silt Fence, Furnished and Installed,
Per Linear Foot LF $11.00 $3,300.00 $12.00 $3,600.00 $10.00 $3,000.00
15 1000
Solid Sod (Match Existing), Furnished and Installed,
Per Square Foot SF $6.00 $6,000.00 $2.50 $2,500.00 $10.00 $10,000.00
16 1
Fire Hydrant Assembly, Furnished and Installed,
Per Each EA $9,165.00 $9,165.00 $15,000.00 $15,000.00 $5,200.00 $5,200.00
17 1
Concrete Cross Anchor for Water Main, Furnished and
Installed,
Per Each
EA $4,200.00 $4,200.00 $8,500.00 $8,500.00 $600.00 $600.00
18 2
Cut and Cap of Abandoned Water Mains, Furnished and
Installed,
Per Each
EA $1,650.00 $3,300.00 $15,000.00 $30,000.00 $2,500.00 $5,000.00
19 600
Water Line Abandonment and Grout Filling, Furnished and
Installed
Per Linear Foot
LF $48.00 $28,800.00 $20.00 $12,000.00 $45.00 $27,000.00
20 1
Prepare and Submit a Record Survey
Lump Sum LS $4,475.00 $4,475.00 $27,500.00 $27,500.00 $10,000.00 $10,000.00
21 1 10% Contingency (Sum Items 1-20 and multiply by 10%)$54,482.25 $60,207.50 $78,311.50
TOTAL AMOUNT OF BASE BID $599,304.75 $662,282.50 $861,426.50
Page 7 of 25
Gator Boring & Trenching, Inc.Equix Energy Services Norris Bros Excavating, LLC
1800 Blackbird Lane,32410 Blue Star Highway,22 Northside Lane,
BASE BID Option 3 Pensacola, FL 32534 Midway, FL 32343 Crossville, TN 38571
Item
No.
Approximate
Quantities Description of Item Units Unit Price Total Price for Item Unit Price Total Price for Item Total Price for Item
1 1
Mobilization/Demobilization, Not to Exceed 5% of Total Bid
Lump Sum LS $12,000.00 $12,000.00 $25,000.00 $25,000.00 $21,945.00 $21,945.00
2 120
12” D.I. Pipe, CL. 350, P-O Joint w/ Restraining Gaskets,
Furnished and Installed,
Per Linear Foot
LF $380.00 $45,600.00 $250.00 $30,000.00 $300.00 $36,000.00
3 280
16” HDPE Pipe, DR 9,DIPS, Furnished and Installed, by
Horizontal Directional Drilling,
Per Linear Foot
LF $276.00 $77,280.00 $630.00 $176,400.00 $1,000.00 $280,000.00
4 2100
Ductile Iron Fittings, Furnished and Installed,
Per LB LBS $24.75 $51,975.00 $32.00 $67,200.00 $6.00 $12,600.00
5 2
12” D.I. Gate Valves, MJ-MJ, Furnished and Installed,
Per Each EA $8,000.00 $16,000.00 $8,500.00 $17,000.00 $4,000.00 $8,000.00
6 2
16” HDPE MJ Adapters, DR9, DIPS, Furnished and Installed,
Per Each EA $1,200.00 $2,400.00 $7,000.00 $14,000.00 $1,000.00 $2,000.00
7 1
3/4” Corporation Stop, Furnished and Installed,
Per Each EA $985.00 $985.00 $350.00 $350.00 $2,000.00 $2,000.00
8 2
Cast Iron Valve Boxes, Furnished and Installed,
Per Each EA $458.00 $916.00 $3,500.00 $7,000.00 $300.00 $600.00
9 2
Concrete Valve Markers, Furnished and Installed,
Per Each EA $400.00 $800.00 $1,250.00 $2,500.00 $150.00 $300.00
10 2
Connection to Existing System, Furnished and Installed,
Per Each EA $9,600.00 $19,200.00 $17,500.00 $35,000.00 $9,000.00 $18,000.00
11 1
Asphalt Trail Pavement Replacement, Furnish and Install
Lump Sum LS $7,411.00 $7,411.00 $7,500.00 $7,500.00 $10,000.00 $10,000.00
12 5
Curb Inlet Filter, Furnished and Installed
Per Each EA $1,150.00 $5,750.00 $150.00 $750.00 $300.00 $1,500.00
13 5
Straw Wattles (20”) Ditch Check, Furnished and Installed
Per Each EA $500.00 $2,500.00 $55.00 $275.00 $1,000.00 $5,000.00
14 300
Silt Fence, Furnished and Installed,
Per Linear Foot LF $11.00 $3,300.00 $12.00 $3,600.00 $10.00 $3,000.00
15 1000
Solid Sod (Match Existing), Furnished and Installed,
Per Square Foot SF $6.00 $6,000.00 $2.50 $2,500.00 $10.00 $10,000.00
16 1
Fire Hydrant Assembly, Furnished and Installed,
Per Each EA $9,165.00 $9,165.00 $15,000.00 $15,000.00 $5,200.00 $5,200.00
17 1
Concrete Cross Anchor for Water Main, Furnished and
Installed,
Per Each
EA $4,200.00 $4,200.00 $8,500.00 $8,500.00 $600.00 $600.00
18 2
Cut and Cap of Abandoned Water Mains, Furnished and
Installed,
Per Each
EA $1,650.00 $3,300.00 $20,000.00 $40,000.00 $2,500.00 $5,000.00
19 350
Water Line Abandonment and Grout Filling, Furnished and
Installed
Per Linear Foot
LF $48.00 $16,800.00 $25.00 $8,750.00 $45.00 $15,750.00
20 1
Prepare and Submit a Record Survey
Lump Sum LS $3,500.00 $3,500.00 $18,000.00 $18,000.00 $10,000.00 $10,000.00
21 1 10% Contingency (Sum Items 1-20 and multiply by 10%)$28,908.20 $47,932.50 $44,749.50
TOTAL AMOUNT OF BASE BID $317,990.20 $527,257.50 $492,244.50
* Highlighted Value denotes corrected value from error on bid form
Robert Vaughan, PE
"I hereby certify that this is a true tabulation of bids received
by the City of Fairhope, Alabama on April 25, 2024 @10:00 AM, Local time
for the Water Main Repair/Replacement at US HWY 98 Crossing Fly Creek Project.
Page 8 of 25
Page 9 of 25
Page 10 of 25
Page 11 of 25
Page 12 of 25
Page 13 of 25
Page 14 of 25
Page 15 of 25
Page 16 of 25
Page 17 of 25
Page 18 of 25
Page 19 of 25
Page 20 of 25
Page 21 of 25
Page 22 of 25
Page 23 of 25
Page 24 of 25
PRF - Fly Creek Water Main Repair
Final Audit Report 2024-04-01
Created:2024-04-01
By:Erin Wolfe (erin.wolfe@fairhopeal.gov)
Status:Signed
Transaction ID:CBJCHBCAABAAB8qkEZ5L2YtergZs68YULTFYPoFyKo_b
"PRF - Fly Creek Water Main Repair" History
Document created by Erin Wolfe (erin.wolfe@fairhopeal.gov)
2024-04-01 - 8:42:14 PM GMT
Document emailed to Suzanne Doughty (suzanne.doughty@fairhopeal.gov) for signature
2024-04-01 - 8:42:18 PM GMT
Email viewed by Suzanne Doughty (suzanne.doughty@fairhopeal.gov)
2024-04-01 - 8:58:54 PM GMT
Document e-signed by Suzanne Doughty (suzanne.doughty@fairhopeal.gov)
Signature Date: 2024-04-01 - 8:59:15 PM GMT - Time Source: server
Document emailed to Kimberly Creech (kimberly.creech@fairhopeal.gov) for signature
2024-04-01 - 8:59:16 PM GMT
Document e-signed by Kimberly Creech (kimberly.creech@fairhopeal.gov)
Signature Date: 2024-04-01 - 11:03:41 PM GMT - Time Source: server
Document emailed to Sherry Sullivan (sherry.sullivan@fairhopeal.gov) for signature
2024-04-01 - 11:03:43 PM GMT
Email viewed by Sherry Sullivan (sherry.sullivan@fairhopeal.gov)
2024-04-01 - 11:27:00 PM GMT
Document e-signed by Sherry Sullivan (sherry.sullivan@fairhopeal.gov)
Signature Date: 2024-04-01 - 11:27:19 PM GMT - Time Source: server
Agreement completed.
2024-04-01 - 11:27:19 PM GMT
Page 25 of 25