Loading...
HomeMy WebLinkAboutWS Item #1 - City Council Packet - City Hall Civic Center Roof Replacement PresentationFY2023 Repair and Replacement of Roof System -City Hall/Civic Center •Background •Options for Building Roof Replacement •Initial Project Plans and Specifications •Bid Process, Code Compliance and Addendums •Resultant Bid for Roof Replacement Background •In advance of the FY23 Budget the City engaged an A&E firm to look at the Roof System and provide options and recommendations •Part of the A&E process was a thorough moisture survey of the entire roof field •±47,854 square feet of Mod Bit roof area & ±11,790 square feet of Gravel roof area •Provided reports, repair recommendations and budget estimates 25,350 Sq. Ft. of saturated (compromised) roof –42.5% of the entire field A&E Budget Estimates –Roof System $1,000,000.00 & A&E Fees $200,000.00 Options •Discussed at WS with Council and lower cost options were requested •PW met with various Roof Contractors and Manufacturers •As a cost savings option PW, brought the project “in house” for design, specifications, bidding and letting •Key Roof Performance Goals: Warranty, Wind & Fire Code Compliant Project Details •Degraded Gypsum (3”) Roof Deck -±13,560 square feet –cut out install B deck and cap with Polyiso Insulation •Heated and Cooled Areas Roof System: GAF EverGuard® TPO (Thermoplastic polyolefin)-60 mil Membrane •Canopy: Clean, strip, install fanfold insulation and cap with GAF EverGuard® TPO (Thermoplastic polyolefin)- 60 mil Membrane •Work included the installation of all flashings, curbing, walk pads, parapet wall treatments and all other appurtenances necessary for a sealed roof envelope Bid & Addendums •Large attendance at the mandatory pre-bid meeting •Wind code compliance became challenging •Multiple request for equivalency of manufacturers products and systems. Systems approved (pre-bid): •GAF EverGuard® Fleece-back TPO Ultra 60-mil Membrane •Versiweld Thermoplastic Membrane (TPO) -60 Mil TPO Roofing System •Duro-Last® PVC Sheet Roofing -Duro-Last® Duro-Tuff® 60-Mil (DT60) membrane •Three addenda were issued Bid Results •Five (5) Responsive Bidders •Three different roof systems that all meet: •Warranty -5-yr workmanship & 15-yr material •Fire and Wind Code •Low Bid (PVC) System -$522,110.00 Base Bid •Unit Price for additional Gypsum Decking replacement $16.00/SF •15% of base as budget holder -$32,544.00 •No hard A&E Costs –PW will Project Manage and conduct Construction Inspection in conjunction with Building Department Bid Results