Loading...
HomeMy WebLinkAboutWS#1 Founders Drainage Presentation by Richard JohnsonFounders Park Existing Drainage In Relationship To the New Track & Field Project Existing Conditions New Track & Field Area 220 L.F. of 36” HDPE 505 L.F. of 30” HDPE NORTH Pipe Condition (Via Video) Pipe Condition (Via Video) Pipe Condition (Via Video) Actual Video Imagery Options: 1.Do Nothing Now –Let the Project move forward knowing the current condition of the pipe –Address the symptoms not root cause 2.Replace only that pipe that is directly under new Track & Field Elements 3.Replace the entire pipe run with new RCP (Concrete Pipe) –725 L.F. Full Repair Plan New Track & Field Area 220 L.F. of 36” RCP 512 L.F. of 30” RCP Fill Old Pipe In Place NORTH Cost For Full Repair: $246,455.98 Partial Repair Would Be Around $165,000