HomeMy WebLinkAboutWS Item #2Litter Abatement
Grant opportunity: 2023
GOMESA Litter Trap Fund
For: Mobile & Baldwin County
1. Grant Request: $168,675 for litter traps
to enhance Fairhope’s litter program
2. This grant requires no match
3. This grant will cover cost of installation
and maintenance for up to 3 years
4. City responsibility: quarterly reporting
5. Reporting information will come from
contractor who will maintain the litter
traps bi-weekly and after rain events, and
providing volume reports monthly
City Staff involved in location selection:
City of Fairhope Staff
Public Works Staff:
Richard Johnson
George Ladd
Planning and Zoning:
Hunter Simmons
Kim Burmeister
Christina LeJeune
*GRANT APPLICATION DUE FEB. 17, 2023 *soft deadline,
extension requested
•Proposal for 12 litter traps:
•1. North Section Street north of Bayou @ Big Mouth
Gully (BMG)
•2. Bayou & North Section in Big Mouth Gully basin
•3. Bayou & North Section at drain (NE corner)-school
•4. City Hall in front of statue @ Oak Street (Big Mouth
Gully)
•5. North Section & Oak -SE corner (BMG) *old
dentist office
•6. North Beach Park round about at fowl sign (Stack
Gully –SG)
•7. North Beach Park @ old boat ramp (SG)
•8. Rose Garden –north side (SG)
•9. Rose Garden –southwest side (SG)
•10. Bancroft & Morphy –NE corner at Coastal
Alabama College (SG)
•11. Fairhope Avenue @ U. S. Highway 98 Shell Station
(Cowpen Creek)
•12. Fairhope Avenue @ U. S. Highway 98 Walgreens
(Cowpen Creek)
•Watersheds Impacted by proposed Litter
Abatement grant:
•Big Mouth Gully -5 locations
•Stack Gully –5 locations
•Cowpen Creek –2 locations
•Though Fairhope is by no means “trashy”, we can improve our
litter program by capturing litter at some of the city’s known hot
spots. Outreach (watershed signage) may also be included.
•If awarded, this grant would supplement Fairhope’s existing litter
program which includes street sweeping, litter pick up by Public
Works staff and the existing litter boom in the Winn Dixie pond off
Morphy Avenue.
•MS4 (Fairhope’s stormwater permit) requires Fairhope to have an
ever-evolving litter program and encourages monitoring and reporting
quantities of litter collected. This will help us achieve that goal.
•This grant requires no matching funding from the City of Fairhope
•The details of this proposal include staff being involved in grant
acquisition, coordination with the contractor and reporting.
•If awarded, the contractor would provide installation, materials
and maintenance of all litter abatement devices. Furthermore, litter
collection will be conducted by the contractor at and around the
abatement site (within 100’ of abatement site) and these amounts will
be included in the reporting and profiling of litter collected.
•Pictured: Volanta Gully near Pensacola Avenue
•Location #1
•Big Mouth Gully
•Proposed: Special Litter trap outside drain
•North Section at Bayou Drive (NE corner at school)
•(Drain pictured downhill is not a candidate for litter abatement since it was installed without a manhole).
•Approved by RJ 2/14/23
•
•Location #2
•Big Mouth Gully
•Proposed: Basin litter trap (on
top of weir structure)
•General Location: North Section
at Bayou inside basin
•Approved by RJ 2/13/23
•Location #3
•Big Mouth Gully
•Proposed: Litter Interceptor inside
drain
•Bayou Drive @ North Section (NE
corner at school)
•(Drain pictured downhill is not a
candidate for litter abatement since it
was installed without a manhole).
•Approved by RJ @ 2/14/2023 meeting
•Location #4
•Big Mouth Gully
•Proposed: Litter
Interceptor
•North Section Street at
City Hall (Statue) near Oak
Street
•Note: Litter observed in
drain
•Approved by RJ at
2/14/23 meeting
•Location #5
•Big Mouth Gully
•Proposed: Litter Interceptor
•North Section at Oak Street, SE corner (in
front of old dentist office)
•Approved by RJ 2/14/23
•Location #6
•Stack Gully @ North Beach park entrance
near Rose Garden
•Proposed: Litter Interceptor
•Approved by RJ 2/14/23
•Location #7
•Big Mouth Gully
•Proposed: Special Litter Interceptor
•Rough Schematic is needed
•North Beach Park at old boat ramp
•Approved by RJ 2/14/23
•
•Location #8
•Stack Gully
•Proposed: Litter Interceptor
•Rose Garden, north side
•Approved by RJ 2/14/23
•Location #9
•Stack Gully
•Proposed: Litter Interceptor
•Rose Garden, southwest side
•Approved by RJ 2/14/23
•Location #10
•Stack Gully
•Proposed: Litter Interceptor
•Coastal Alabama College
•Morphy & Bancroft
•Approved by RJ 2/14/23
•Location #11
•Cowpen Creek
•Proposed: Litter Interceptor
•Shell station
•Fairhope Avenue @ U. S. 98
•This is a city-owned drain (not AL-DOT), per
George Ladd
•Note: damage of drain will not affect
installation or operation of litter interceptor per
Don Bates
•Approved by RJ 2/14/23
•Location #12
•Cowpen Creek
•Proposed: Litter Interceptor
•Walgreens
•Fairhope Avenue @ U. S. 98
•This is a city-owned drain (not AL-DOT), per
George Ladd
•Approved by RJ 2/14/23
ADEM letter of intent
from RJ 2/15/23
•Contact Kim Burmeister
•City of Fairhope Planning and
Zoning Department
•251 990-2877
Pictured: Red
Gum Gully